The final punch list work is occurring along Lake Street

The contractor began landscape restoration and punch list work along Lake Street from Center Street to IL 83.

Next week, weather permitting, the contractors plan to;

  • Complete the final punch list work along Lake Street from Center Street to IL 83.

Motorists should expect periodic lane closures along Lake Street as punch list work continues. Please continue be alert and aware of flaggers when traveling through the work zone.

Paving final asphalt surface along Lake Street begins

The contractor began to pave the second, and final, layer of asphalt along Lake Street from Center Street to IL 83.

Next week, weather permitting, the contractors plan to;

  • Complete the paving of the second layer of asphalt along Lake Street from Center Street to IL 83.
  • Install the new pavement markings along Lake Street from Center Street to IL 83.

Motorists should continue to expect daily lane closures along Lake Street as progress continues. Please be alert and aware of flaggers when traveling through the work zones.

Continued work on Bike Path along Lake Street

The contractor paved the bike path from Doolittle Park to Jamestown Court this week. They also adjusted the frames for the remaining concrete sidewalk sections.

Next week, weather permitting, the contractors plan to;

  • Complete the remaining sections of concrete sidewalk along Lake Street from Center Street to IL 83.
  • Complete the area around the bike path.
  • Finish installing the traffic signal loop detectors.
  • Place the guardrails.

Motorists should continue to expect daily lane closures along Lake Street as progress continues. Please be alert and aware of flaggers when traveling through the work zones.

 

Asphalt paving begins along Lake Street

The contractor paved the first layer of asphalt along Lake Street from Center Street to IL 83.

Next week, weather permitting, the contractors plan to;

  • Complete the remaining sections of concrete sidewalk along Lake Street from Center Street to IL 83.
  • Complete final preparations and pave the asphalt bike path from Doolittle Park and Jamestown Court.
  • Continue to install the traffic signal loop detectors in various locations.

Motorists should continue to expect daily lane closures along Lake Street as progress continues. Please be alert and aware of flaggers when traveling through the work zones.

The Pavement Grinding is Complete along Lake Street

The contractor removed the top surface of the existing pavement along Lake Street from Center Street to IL 83. They also sprayed a prime coat, and weather permitting, plan to pave the first layer of asphalt along Lake Street from Washington Street to IL 83 on Saturday, June 23rd.

Next week, weather permitting, the contractors plan to;

  • Pave the first layer of asphalt along Lake Street between Center Street and Washington Street.
  • Complete the remaining sections of concrete sidewalk along Lake Street from Center Street to IL 83.
  • Pave the asphalt bike path from Doolittle Park and Jamestown Court.
  • Install the traffic signal loop detectors in various locations.

Motorists should continue to expect daily lane closures and lane shifts along Lake Street as progress continues. Please be alert and aware of flaggers, construction workers, and construction equipment when traveling through the work zones.

 

Several Construction Operations are ongoing along Lake Street

The contractor framed and poured sections of curb & gutter and sidewalk along Lake Street between Carol Lane and IL 83, and they removed the existing median at the railroad crossing.

Next week, weather permitting, the contractors plan to;

  • Continue to frame and pour the proposed curb & gutter, median, and sidewalk along Lake Street.
  • Continue the excavation and stone base installation for the bike path.
  • Continue to lower down the existing manhole frames in the roadway.
  • Continue to install electrical conduit for the traffic signal components.
  • Begin to grind the existing pavement and begin various pavement patching along Lake Street from Washington Street to IL 83.

Motorists should expect daily lane closures along Lake Street as the improvements continue. As always, please be alert for construction workers and equipment.

Concrete Work is Progressing

The contractor continued to remove the existing curb & gutter and sections of sidewalk along Lake Street between Carol Lane and IL 83. They also excavated for the bike path and planted trees along the bike path.

Next week, weather permitting, the contractors plan to;

  • Continue to frame and pour the proposed curb & gutter and sidewalk along Lake Street from Carol Lane to Center Street.
  • Remove and replace the existing median and curb & gutter at the railroad crossing.
  • Continue the stone base placement for the bike path.
  • Continue to lower down the existing manhole frames in the roadway.

Motorists should continue to expect daily lane closures along Lake Street as progress continues. Please be alert and aware of flaggers when traveling through the work zones.

Curb & Gutter Work Along Lake Street Continues

The contractor continued to remove the existing curb & gutter and sections of sidewalk along Lake Street between Carol lane and IL 83.

Next week, weather permitting, the contractors plan to;

  • Continue to frame and pour the proposed curb & gutter and sidewalk along Lake Street from Carol Lane to IL 83.
  • Continue the excavation and preparation for the bike path.
  • Continue to lower down the existing manhole frames in the roadway.
  • Plant new trees along lake Street from Doolittle Park to Jamestown Court.

Enjoy your Memorial Day weekend!

Lake Street Roadway Improvements Continue as Scheduled

The contractor poured the proposed curb & gutter along Lake Street, north of Washington Street.

Next week, weather permitting, the contractors plan to;

  • Continue the removal and replacement of the proposed curb & gutter and sidewalk along Lake Street from Carol Lane to IL 83
  • Begin excavation and preparation for the bike path paving
  • Begin to lower down the existing manhole frames in the roadway

Motorists should expect daily lane closures along Lake Street as the improvements continue. As always, please be alert for construction workers and equipment.

Proposed Curb & Gutter Work Begins Next Week

The contractor completed the preparation work for the proposed curb & gutter along Lake Street, north of Washington Street.

Next week, weather permitting, the contractor plans to begin the installation of the proposed curb & gutter along Lake Street from Carol Lane to IL 83.

Daily lane closures along Lake Street should be anticipated for this process, so please be alert when traveling through the work zones.